top of page

Liberty Blog Posts

Stay in touch!

Sign up with your email address and get Liberty Blog posts to your inbox as they are posted. Click here to sign up!


We will be doing the monthly fire alarm testing on Tuesday, February 2nd at 6:45 p.m. The bells and fire signals will ring briefly during this time. No access will be needed to suites.This is a monthly test of the hallway alert system as required by the BC Fire Code.


We will be doing the monthly fire alarm testing on Tuesday, January 5th at 6:45 p.m. The bells and fire signals will ring briefly during this time. No access will be needed to suites.This is a monthly test of the hallway alert system as required by the BC Fire Code.

The water will be shut off in the 19388 building only on Tuesday, December 1st starting at 9:00 a.m. Technicians are repairing a small leak in the main water feed pipe that will necessitate turning off the water supply for some of the day. The 19366 building (West) is not affected by this shutoff. Schubert Plumbing and Heating will be on site and will restore the water as soon as possible. We are sorry for the inconvenience.


Tags

Archive

Recent Posts

bottom of page