top of page

Liberty Blog Posts

Stay in touch!

Sign up with your email address and get Liberty Blog posts to your inbox as they are posted. Click here to sign up!



Coras Automation is on site this week fitting our garage vestibules (the doors that lead to the elevators) with Ditec Entrematic operators. Residents coming from the elevator to the parkade can just push the large button on the wall to the left and have the door open automatically, or just open the door with the handle as before. Residents coming from the parkade side will still need to swipe their door fob. They can then choose to open the door by pushing the door handle (as before), or by pressing the large square button below the fob reader, the door will open automatically for them. To ensure a secure building, please make sure the door closes behind you before you step in to the elevator.


Questions or comments? Drop us a line!




C&C Electrical Mechanical will be on-site to complete the annual boiler cleaning. The hot water will be shut off for three hours on Tuesday, April 9th 2024 according to the schedule:


  • 8:00 a.m. - 11:00 a.m. - BUILDING 19366 (West)

  • 11:00 a.m. - 2:00 p.m. - BUILDING 19388 (East)

  • 2:00 p.m. - 5:00 p.m. BUILDING 19378 (clubhouse)


Questions about this service can be directed to:

C&C Electrical Mechanical101-1515 Broadway Street

Port Coquitlam, BC604-475-7077


The cold water supply should not be affected during this service.

Thanks for your patience and understanding.


The car wash stall next to the 19366 entry is open again for self-service. Please rinse soap and dirt debris into the drain after washing and make sure to close the valve next to the hose hanger when you are finished.


Tags

Archive

Recent Posts

bottom of page